Project Of Maanshan 500kV Switch Station Expansion To Substation


Country

China

Region Anhui Province
Approved By Liaoning Provincial Development And Reform Commission
Category Energy & Chemical
Total Investment 131.23 million RMB.
Published Date July 18, 2006

Property: the Electric Power Consulting Group Co. printed the project evaluation meeting summary in No.2006-117 Document.

Brief Introduction:

The project will expand the 500kV switch station to the substation, and will construct the 750MVA main substation of one group and the relating 3-sides intersection, one circuit of 500kV outlet, 9 circuits of 220kV, and to install 3 sets of 60MV low voltage parallel connection switchs, and the relating once and twice parts and the civil construction. The 500kV is the half-switch connection. The future planning is 8 lines 3 substations, of 5 complete parallel connection, the line planned by this phase will connect the No.3 and No.2 parallels, and will increase 3 sets of switches. The 220kV will connect to this line through double parent line of double sections, which will be connected in this phase. The 35kV is of single parent line connection, and will not have general circuit breakers.

The static investment is RMB 128.09 million, and the dynamic investment is RMB 131.23 million.
 

Contact:
Construction Unit: Huadong Grid Co., Ltd.

Address: No.201 Nanjing East Road, Shanghai, China

Post code: 200002

Tel: 86-21-63290000